This is the framing of the bathroom in one of the apts. The rough opening for the door is visible, aswell as the jack stud, king stud, cripple studs, header, and top plate. The single hung window is also visible with the header and sill
This man is insulating the pipes that are installed in the ceiling, insulating water pipes can prevent heat loss and freezing. On top we see the rigid insulation, and the joints between the sheets that are sealed.
We can also see the section of a wall, the studs and the layer of drywall
This is a view of the hallway, it is fuly framed, it is waiting for the drywall. The manager i was talking to said that it took 20 guys a total of NINE days to frame this entire floor (pretty impressive, in comparison to the weeks it took 6 people to frame a small section)
This is the electricians panel , it is installed between the studs in the wall, in the back ground we ca n see the cripple studs and the wall studs