Description: In this picture we can see into the room and we see the framing and the beginings of interior work. On the celings there is a layer of attatched rigid insulation. We can so see the rim joist going across and being attatched to the floor.
At this time there is also a fire sprinkler system installed -its going to effect the type of construction and the effects of building code and zoning laws.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment